Achievement: Installation of industrial equipment in a material recovery center
PIERVAN's role: The PIERVAN team carried out major lifting work, namely the installation of mechanical components of a conveyor system for a sorting center. Everyone’s cooperation led to the success of this installation directly on site.
Industry: Manufacturing
Scope: $1M - $2M
Date: 2021
© All rights reserved, Groupe PMI 2024 | Privacy Policy
Web design and strategy by Guarana Marketing