Achievement: Installation of a chlorine distribution network and bagger
STIM's role: Our team on site installed several pieces of equipment, including eight conveyors, a bucket elevator, a bagger, and a dust extraction network to improve the manufacturing process. Related pneumatic and hydraulic systems necessary for the operation of this distribution network were also installed during the project.
Industry: Chemicals
Scope: $500K - $1M
Date: 2022